

| Location:Lat 10 19' N; Long 75 35' W. Bocachica Entrance Channel Draft: Vessel with 13m S.W. draft and max 42m of beam are not restricted at the Navigation Channel. Vessel with draft over 13m S.W. and 42m of beam must comply with: The maneuvers are subject to previous authorization from the harbor master office ( the authorization must be requested at least 48 hours in advance ). Vessel must be assisted by minimum 2 (Two) tugboats and 2 (two) pilots Restricted to early morning hours and weather conditions. Services Available: Bunkers, Fresh Water, Provisions, Workshop Repairs, Dry-docks up to 3,600 DWT, Security Services (Watchmen), Class and various Inspections. |
 |
ABOCOL General Information: Total length of berth : 200 meters Max LOA : 130 meters Max Draft : 22' BW 2 (Two) Hoppers connected to shore belt scale with 15M3 capacity abt. Used for discharging bulk cargo. 2 (Two) Hoppers; 3 (Three) Grabs. 24 hours SHINC all year around
 |
ALGRANEL TERMINAL General Information: Number of berth : 1 (One) Max LOA : 180m Max Draft: 26ft BW Connections 4" / 6" Hoses Loading / Discharging Rate : 200 MT/H Number of Shore Tanks : 34 Shore Tanks Capacity : 21,000 M3 24 hours SHINC all year round
 |
COLTERMINALES TERMINAL
General Information: Number of berth : 1 (One) Max LOA : 180m Max Draft : 28ft BW Connections : 4" / 6" Hoses Loading / Discharging Rate : 200 MT/HR Number of Shore Tanks : 20 Shore Tanks Capacity : 8,036 M3 24 hours SHINC all year round

|
CONTECAR General Information: Pier Length 383 mts. Max Draft : 41ft BW Two mobile crane with a lifting capacity of 100 tons and a maximum radius reach of 50 mts. 24 hours SHINC all year around

|
ECOPETROL NESTOR PINEDA TERMINAL (TNP) General Information: Number of berth: 1 (One) Max LOA: 260 meters Min LOA: 175 meters * Max Beam: 38 meters * Min Beam: 25 meters * Max DWT: 85,000 * Min DWT: 25,000 * Max Draft: 40 ft BW * Vessels always berth starboard side to * 3 x 10" Tubular Arms connected For Loading Fuel Oil and Receiving Crude Oil. * 2 x 10" Tubular Arms connected for Loading Aromatics ( Benzenes and Xylenes ) Max Pumping Rate for Receiving Crude oil and Loading Fuel Oil 20,000 bph. Max Pump Pressure 150 psi Max Pumping rate for Aromatics Products 15,000 bph. Max Pump Pressure 150 psi. 24 hours SHINC all year round.

|
ECOPETROL REFINERIA TERMINAL
General Information: Number of bert:1 (One) Max LOA: 260 meters Min LOA: 150 meters Max Beam: 38 meters Min Beam: 20 meters Max DWT: 85,000 Min DWT: 12,000 Max Draft: 40 ft BW 3 x 10" Tubular Arms connected For Receiving / Loading Crude Oil. 2 x 10" Tubular Arms connected for Loading Diesel Oil. 1 x 10" Tubular Arm connected for loading Gasoline / Kerosene / Turbo jet / Spent Caustic Soda. 1 x 8" 150 ANSI Flexible Hose connected for loading Anhydrous Ammonia. Max Pumping Rate for Crude oil 20,000 bph. Max Pump Pressure 150 psi. Max Pumping rate for Gasoline 10,000 bph. Max Pump Pressure 150 psi. Max pumping rate for Diesel Oil 7,000 bph. Max pump pressure 150 psi. Max Pumping rate for Kerosene and Turbo Jet 2100 bph. Max pump pressure 150 psi. Max pumping rate for Spent Caustic Soda 2000 bph. Max pump pressure 150 psi. Max pumping rate for Anhydrous Ammonia 400 mt/h. Max pump pressure 150 psi. Working time:24 hours SHINC all year round.

|
ECOPETROL LPG BERTH
General Information: Number of berth: 1 (One) Max LOA: 110m Max DWT: 4,100 Max Draft: FWD 5.0m AFT 6.0m Note: Draft restriction subject to the position of ship's manifold, in specific cases loading master will determine if the ship is able to berth at the terminal. Connection System is a bridle of 6in diameter and ANSI 300. The distance between the bridle and the external part of the pier is 6.0m Depth at Platform is 6.0m Propane and Butane handled through 6in line and 6in flexible hose Loading rate 1800 bph Vessel in ballast shall not have greater than 4ft trim difference between the fore and after draft. Working time:24 hours SHINC all year round

|
MALTERIAS - BAVARIA BARLEY TERMINAL General Information : Number of berths : 1 (One) Max LOA : 170 meters Max Draft : 32ft BW DWT Restriction: 31000 Mooring/Unmooring operations restricted to daylight Discharge average rate: 3,500 MT/Day Shore suction equipment used, one intake. Normally 24 hrs 7 Days operations depending charter party
 |
MUELLES EL BOSQUE
General Information: Grain service capacity. Grain storage capacity: 35000 MT 3 Grabs 12 m3 capacity 1 Grab 20 M3 capacity 1 Grab 26 M3 4 Hopers 20 tons capacity Lo-Lo berth of 330 meters length. Operational Draft: 10.7 meters Container Yard 60,000 M2 Storage capacity of 3000 TEUS Handling capacity of 120,000 TEUS per year. General Cargo covered area 12,000 M2 2 Mobile LIEBHERR LHM 400 crane with a lifting capacity of 104 tons. 1 Crane PACECO with a lifting capacity of 65,000 lbs Four (4) RTG24 hours SHINC all year around
 |
PUERTO DE MAMONAL
General Information: Total length of berth 300 mts. Max LOA 190 meters Max Draft 11.30m BW Two Cranes 150 tons 2 Hoppers 2 Grabs 10 M3 Yards storage capacity for coal 100,000 ton Warehouse 3,500 m2 24 hours SHINC all year around
 |
SPRC / Sociedad Portuaria Regional de Cartagena: General Information: 9 docking positions Two (2) sites for Roll On - Roll Off. Cruise Ship Terminal Draft to 45'. Attention to all Post-Panamax generation vessels. Storage in warehouses, shed or container yard depending on cargo needs. Five warehouses in 28.000 M2 Logistic distribution centers. General Cargo Yard s Container Yards 2 Mobile GOTTWALD HMK 280 E Cranes. Lifting capacity of 100 MT and a maximum radius reach of 44 mts and average handling speed of 25 containers per hour. 4 Post Panamax Gantry Cranes for container and general cargo have an average reach capacity up to 44 meters and can move 20',40' and 45' containers with a maximum weight of 52 tons. An efficiency of 45 container movements per hour can be obtained under ideal conditions. 8 RTG’s . These RTG have the capacity of lifting containers up to 40 tons of weight. Working time: 24 hours SHINC all year round
 |