
Pilot Boarding Coordinates: LAT 09 31’00” N, LON 75 37’30” W Terminal's Name: Tolcementos
Prevailing weather Conditions: Good
Use of Tug Boats for Berthing / Unberthing are 100% compulsory in all the cases?: Yes (no exemptions)
Tide Var for Bething / Unberthing: N/A
Is Berth well Fendered and with no Hidden Obstacles?: Yes
Type of Bottom Alongside the Berth: Sandy
Distance from Water Label to top of Quay: 2.40 Meters
Distance from the Border of the Quay (Fender Included) to the Structure of the Belt Conveyor System: 8.0 Meters
Length of the Berth: 210 Meters
Max. Possible berth Area Used for Berthing: 180 Meters
Water Density: 1.025
Max. Draft Channel: 34’ S.W.
Max. Permitted Departure Draft: 34’ S.W.
Max. Permitted Draft Alongside the Berth: 34’ S.W.
Side Vessel Usually Berthed: Port Side
Loading System: Fixed Belt Conveyor
Max. Air Draft (Water Label to Hatch Top): 13 Meters Only for Loading
Max. LOA. : 200 Meters
Max. BEAM : 30 Meters
Are VSL'S Crew Allowed to Drive VSL Cranes / Grabs?: Yes
Working Time: 24 Hrs. Shinc.
Berthing / Unberthing: 24 Hrs. Shinc.
No Freight Tax Appicable
Fresh Water Available Us 8.20/MT: By truck only
Garbage Collection Compulsory?: No
Does Port Authorities Permit VSL'S Crew to Carry Out Maintenance Work on Vesel Hull Like Sacrapping and Painting?: No |