HOME I NEWS IFAQ I CONTACT US I SITE MAP   
 
Barranquilla
Buenaventura
Cartagena
Coveñas
Puerto Bolívar
Santa Marta
Tolú
Tumaco
Turbo




Peso strengthens to COP1,849.5 on FDI inflows   28-07-2010
The Colombian peso strengthened Tuesday, reaching its strongest level against the dollar since October as inflows of foreign direct investment continue to boost the currency.More ...
BofAML raises Colombian 2010 GDP forecast to 4%   28-07-2010
Hopes that the incoming Colombian president will be able to implement much-needed structural overhauls along with resilient private consumption is creating a more optimistic outlook for the country's sovereign credit, Bank of America Merrill Lynch said.More ...
Coffee production to reach 14 million bags in 2015   28-07-2010
With the renovation of half a million hectares of coffee plantations and various projects aimed at increasing output, the National Federation of Coffee Growers (Fedecafe) announced plans to produce 14 million bags of coffee in 2015.More ...
View more News

Home > Colombian Ports Information > Puerto Bolívar

Puerto Bolívar





Location:
LAT. 10 DEG. 41 MIN. N LONG. 74 DEG. 44 MIN. W

According to port regulations, a vessel is considered arrived in port when she is 2 miles from following position: lat. 12 d. 17.5 m north and long. 71 D. 58.9 m west.

Following approaching navigation charts must be available onboard to be
presented to local authorities upon arrival Puerto Bolivar, in case is requested:

229 Bahia Portete ; 028 Barranquilla- Puerto Espada; 007 el Gran Caribe ; 002
North Coast Colombia ; 040 Guajira Peninsula.

CONDITIONS/ RESTRICTIONS AT PUERTO BOLIVAR:

No crew shore landing is allowed, except master/chief engineer in special cases, due absence of immigration office.
No provisions, bunkers or water is available to vessels.
Limited medical assistance is available at the port.
It is very important that master looks very closely at deballasting time, considering that load rate may average between 4.500 and 6.000 mt/hour, with peaks of up to 10,000 mt for panamax and cape size vessels. Should vessel delay loading, a penalty for waiting may be imposed on vessel.
For loading coal is available one shiploader.

PORT RESTRICCIONS

Max. LOA: 300,0 mts
Max. BEAM: 45,0 mts
Max. Loaded Draft: 17,0 mts
Max. Arrival Draft: 9,0 mts
Max. Air Draft: 21,0 mts (measured to the highest point of the hatch cover)


 
No Files available
Returm to list

 

 

Main Office Cra. 12 No.79-32 Piso 4 Bogotá - Colombia Phone: 57-1-3172400 PBX / 3172459 / 3172470 / 3173499
Fax: 57-1-3172404 / 3171958 Telex: Via U.K: 051-9407 6528 NAVE G www.navescolombia.com

 

Desarrollado por Imagine S.A.